Slowly, But Surely, Things Are Getting Done

But does it have to be so slow!

Just a beautiful picture of the boats and the Mare Island Bridge in Vallejo

I’ve noticed, not for the first time, I may add, that I never start and finish anything in a direct line. Project A starts, but at some point, I’ll start Project B and maybe even C, while A limps along.

Why, I wondered? It certainly seems inefficient and worse of all; I’m always tripping over all the “stuff” laid out. I won’t even take a picture of the chaos as it’s embarrassing, but evidently not so embarrassing that I would change my ways.

So, why do I do it?  It’s combination of my ineptness whenever I do something the first time, coupled with my unease, once I see that I should have done it differently and probably better. My brain, all brains, need processing time. “Sleeping on it” is part of that process.

My instruments on the laid down mast

Therefore, while it may seem inefficient at first glance, there is almost nothing on Dauntless that survived the first cut and sometimes even the second cut.

My mast instrument project is finally done. I also replaced all the cotter pins and a few clevis pins also. The rigging for my paravane stabilizers was carefully inspected also. I was pleased to see only minor wear over the last 25k+ miles and 5 years. Sad to say, I’d say that 80% of my cruising has needed the paravanes deployed. Sad because it means I need to stay home more often, but then when your home is constantly on the move, …

I did update my C-Maps for the west coast and Alaska. Figured there was no reason to save it for the last minute. I also have a rough cruise plan to get to Seattle in June. That will be in an upcoming post.

I was hoping to finish the replacement of my driving light bracket and cross bar with the new stainless-steel versions. All has gone to plan, except I have discovered I made the driving light brackets 9 mm to narrow, that’s about a third of an inch.

Oh well, luckily, I’m flying to Vietnam next week for two weeks and I can get new brackets made for a couple of bucks. Now, the plane ticket is another story.

I just soldered these 4 wires

Easy Come, Easy Go.

Dauntless without her driving lights (But how is she going to sea?)

 

 

One thought on “Slowly, But Surely, Things Are Getting Done

  1. Hi

    A delivery captain who made the trip about a month ago, told me from Cape Mendocino to north of Cape Blanco, there were tons of logs. He was in close to the coast. Maybe cleared up by now. I’m not sure if crab season is open, stay out beyone 100 fathoms and you shouldn’t have any crab pots

    Chuck Herr

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s