We departed Key Largo 10 December and returned to Miami, 31 January 2014.

Overview of the Dauntless' Bahamas Adventure
Overview of the Dauntless’ Bahamas Adventure

In those 53 days, I had to leave dauntless and return to NYC for 23 days (I didn’t want to miss the snowstorm).

Total days on boat (not including 23 days I was in NYC) 30 days, of these 30 days,  two thirds of our days were spent moving from one place to another.  Most were small moves, but we had a third of the time that we had a full day, 6 to 8 hours, or more, of travel.  The only time I spent more than two nights in the same place was the 5 days in Nassau, when I came back from NY, as I got the boat ready to return to Florida.

We traveled 700 nm in 135 engine hours, averaging 5.2 nm/hr., consuming 215 gal of diesel.  Now, this =1.6 gal/hr., but the fuel consumed includes 47 hours of Generator time.  We did have a little Inverter problem, which meant that we had to run the generator probably 50% more time than normal to charge the batteries.

But even with that, if I subtract about 40 gal from our use, the main engine only used about 1.3 gal/hour! Which equals 4 nm/gal and at $4.00/gal cost of fuel, a rough estimate is $1/nm.

KK42-148 has been exactly what we needed and hoped for.

Thank you Dauntless.  Now, I do happen to have a few shenanigans to relate.