What’s Done So Far

Slowly, but surely progress is being made. I have completed the following: Installation of outside LED rows and inside wiring, Amazon LED Link Added another power line for the pilot house electrical panel and also added an additional ground, Replaced the terminal block for the 120v system neutrals in the engine room distribution panel, ReplacedContinue reading “What’s Done So Far”