Getting Ocean Ready

I’ve been ready to leave Vallejo for a month now. This is getting old. But I have vowed not to let myself be beat up any ore than usual. I spent much of last week organizing parts. I thought I had only two types of hose clamps, stainless and non stainless, which I separated lastContinue reading “Getting Ocean Ready”

What’s Done So Far

Slowly, but surely progress is being made. I have completed the following: Installation of outside LED rows and inside wiring, Amazon LED Link Added another power line for the pilot house electrical panel and also added an additional ground, Replaced the terminal block for the 120v system neutrals in the engine room distribution panel, ReplacedContinue reading “What’s Done So Far”