Phase I is Done

Dauntless after her second coat of primer
Dauntless after her second coat of primer

Phase I was doing he stuff that had to be done before Dauntless got her feet wet.  All done except for salt water pump.  For a competent person, this is a few days work; for me about three weeks.

  • Forward Bilge
    1. Complete hookup of New Vetus holding tank, with new fittings and electrical
    2. Install new bilge pump (old one becomes spare) with new check valve
    3. Make additional fresh water hookup and run hose to forward compartment for Raritan Purisan
    4. Check connections for salt water pump (new, hasn’t worked since installed)
    5. We found a bare wall bulkhead in front of old holding tank. Gary sealed it and put Gelcoat on it.
    6. Check all clamps for the multitude of thru hulls in this area
  • Anchor Locker
    1. Pull all the chain and rode out for both anchors
    2. Vacuum the bottom of chain locker
    3. Replace two deck fittings for fresh & salt water connections
    4. Re-mark and reverse anchor chain
    5. Add 90 feet polypropylene to end of chain rode (this is because it floats, making it easier to find should I have to abandon anchor with no time for anything else)
    6. Paint anchors
    7. Find third anchor for stern
    8. Make up a new, longer chain snubber

The Electrical list is untouched, but the first four items a-d, will be done in the next days.  The rest in the next two months.

  • Run new VHF cable to the two radios
  • Replace plugs for Navigation lights
  • Add Name Board lights
  • Install new Driving lights
  • Add USB ports in salon and second cabin
  • Add new switch and breaker panel for fridge/freezer in pilot house
  • Add switch panel for solar panels

Once D is out of the shed we will be able to re-rig the Paravanes and the mast.  Gary’s carpenter has made another bird that got broken in the North Sea and has repaired the doors.  The Rocker Stoppers are a work in progress.

  • Restring birds to new line, 3/16” Amsteel, so that I can modify the depth of the birds.
  • Boat Yard is making rocker stoppers for me to use while at anchor

For the Wood Trim, I can’t oil anything until all the sanding is done. I will do this next week, before we head out of the shed into the hard, cruel world.

  • Teak “eyebrow” around pilot house has been scrapped and sanded thanks to Leonie & Martin. I will put Tung Oil on it and see how that works.
  • Oil all the benches that have been sanded

Fuel tank is in the final stages of being done.  Sealant has been applied and new inspection ports are ready to be installed. Anti-Foul will be applied the last day, next Friday.

Most of the heavy lifting by Gary and the New Ross Boat Yard are done or will be in the next week:

  • Port fuel tank sealant and new inspection ports
  • New bottom job, with two coats of epoxy and one of a tie-coat
  • New anti-foul by International, a semi-hard coating that is made for slow boats like Dauntless and should last at least a few years.
  • Painting of the hull from the cap rails down, including the bow pulpit
  • Fixing on of the side doors that while latched open this past winter the winds ripped if off the hook and broke the entire frame. (winds this winter were higher than 100 knots or 110 mph.
  • New Bow thruster blades

Getting the forward cabin and compartments fixed, cleaned and put away was the big monkey on my back.  It was critical to get done and as long as it was unfinished the boat was unlivable.

I’ll start sleeping on board Friday.  It’s feeling like my home again.

My first glass of wine on Dauntless since October.
My first glass of wine on Dauntless since October. And looking forward to forward cabin.

Gary is just finishing applying the second primer coat.  That will get sanded tomorrow, then washed again with an Awlgrip wash (a solvent, like paint thinner) before the first finish coat goes on.  At that point we will actually see the final color.  I hope I like it!

I literally had my first glass of wine on board, the first since October (I’ve had wine, not just in a glass!). I do have rituals you know.

P.S.  Here is a bonus video of Gary applying the second primer coat today. ( I don’t post many videos because it takes hours to upload one video sucessfullly.)

Error
This video doesn’t exist

Ireland Part 1

A Tunnel of Green, (one of the more meager ones)
A Tunnel of Green, (one of the more meager ones)

It’s going to be hard to say goodbye to Ireland, the land is gorgeous, the people wonderful and the sun shines at least once a month to remind you what it looks like.20160515_173827.jpg

Today, I took a day off.  Every day I’ve been working on Dauntless, getting my little projects done.  The new holding tank is in and connected, the bilge pump also, so forward bilge work is almost done.20160515_141652.jpg

20160515_173436.jpg
Byrne & Woods, Roundwood

So, with the sun out and the buds on the trees getting bigger by the day, I thought it would be a good day to drive to the town of Roundwood, about 70 miles NE of New Ross, about 30 south of Dublin.

Well the drive turned out to be even prettier than expected.  The roads were even more picturesque and the traffic was actually minimal.

The restaurant, Byrne & Woods, lived up to expectations. Here is a link to my review:

Bryne &

the drive home
the drive home

Woods

20160515_184332.jpg
Out the side window, while I waited for the cows to go home.

 I Love Brilliant Women

And even just really competent ones or highly functional ones.  What brings this to mind?

First Primer Coat
First Primer Coat

Another episode of Wallander of course.  The Cellist.  Watching the beginning, seeing her play, yes I know it’s drama, not real, but I realized how attractive I thought she was and realized it was far more than just her European nose, but was really based on nothing, other than her play.

Yet, knowing her play is fake, makes no difference. We are programmed to like what we like and I like smart, competent women.

Writing and sometimes even publishing in this blog, is my way to express my thinking.  Not having that mind-mate for the first time in a long time is what’s hard.

Did you see this? You should read that!  Long distance is no problem.

Oh, by the way, if you like Prosecco, as I do, you should only drink the DOCG.  The DOC is a new appellation that the Italians cooked up to take advantage of the popularity of Prosecco worldwide. The problem is the DOC prosecco is made in places that are not dei colli Conegliano – Valdobbiadene, the little hills to the northwest of Treviso that make Prosecco, Prosecco.  Another beautiful creation or is it brilliant?

And another story revolving around a brilliant woman.

But can we really separate beauty and brilliance?

OK, let’s get back to our Lady Dauntless.

So Dauntless is beginning her transformation to the new “Dauntless” look.  In the next days’ I will be posting the details and pictures. For now, you see her in her undercoat.

A true functional beauty.

Dauntless Cruise Plan 2016-17 Europe to Asia

Make the Plan, Do the Plan.

So here is the plan.  The first four months show little change, but after I get back from the USA in mid-October it will be a lot of cruising.

Previously I had decided to stay in Europe this coming year, but life happens and circumstances change. Therefore, In November Dauntless and I will start to head west not to return for many years.

The good news is that while it is a lot of miles, over 17,000, those miles are spread over 17 months.  Since almost 10,000 miles are passage miles, in which we do about 150 miles per day, it means that over 300 days of the 500 we only have to average about 35 miles per day.  Much less than last summer.

So, while nothing is in stone, this is the tentative plan and you know me: Make the Plan, Do the Plan.

The dates are somewhat firm in that to get to Korea in the fall of 2017, I must be able to get to Japan in early August, as I want to cross the Bering and North Pacific in July and early August.

This is a plan that is based on the weather, meaning it’s doable with “normal” weather.  But there are a number of things that must happen:

  • Leaving the Canaries for the Caribbean needs to happen by early December.
  • Arriving in Kodiak, Alaska needs to happen by early July 2017.

Now of course, this depends on a few factors besides just the weather.  I could be kidnapped by some Greek and decide to spend a year in Lesbos with the rest of the refugees.  Some other mechanical or personal issue could overtake plans.  But most likely, the weather does not cooperate.  For this plan to work, I must have favorable weather during the winter and spring along the west coast of Central and North America.

If the winds do not cooperate, then we’ll spend the winter and spring in Central America and Mexico, then come up the west coast to B.C. and S.E. Alaska for the summer and winter over in S.E. Alaska, a fantastically beautiful destination all in itself.

This Plan B is not a terrible outcome and I’m sure many will think it should be Plan A, but I’ll let Fate and the wx gods decide.  At best it’s a 50-50 proposition, or maybe better yet, 49-49-02, the 02% being something unforeseen like the Greeks or something.

Want to join me at any part?  I can always use help, extra hands and advice, and most of all, the company.  We will be doing a lot of miles, over 17,000 but who’s counting!  There will be many opportunities in the next 17 months, but the better times (summer vacation) and destinations, (Caribbean, Central America, Mexico, Alaska) will fill before the more tedious parts.

Oh, wait, there are no longer any tedious parts.

In any case, drop me a line and let me know your thoughts, no matter how tenuous.

Richard on Dauntless

I expect to be in the place or nearby by the date in the column to the left.

.E.g. I expect to arrive in the Lesser Antilles on 22 December.

25-May-16 Ireland, Feet Wet
02-Jun-16 Scotland
18-Jun-16 Ireland, Waterford
02-Jul-16 Ireland, Waterford
07-Jul-16 France, Brest
05-Aug-16 Spain, San Sabastian
25-Aug-16 Spain, A Coruna
15-Oct-16 Spain, A Coruna
20-Oct-16 Portugal, North
10-Nov-16 Portugal, Algarve
16-Nov-16 Gibralter
22-Nov-16 Morocco (maybe)
28-Nov-16 Canaries
05-Dec-16 Canaries
22-Dec-16 Lesser Antilles
12-Jan-17 Panama Canal
01-Apr-17 Baja Calif
02-May-17 Southern Cal
20-May-17 Pac NW, Seattle
15-Jun-17 SE Alaska
01-Jul-17 Kodiak
08-Jul-17 Dutch Harbor
16-Jul-17 Attu
25-Jul-17 Japan, Hokkaido
21-Sep-17 Japan, South
12-Oct-17 Japan, South
14-Oct-17 Busan, South Korea
01-Nov-17 Yeosu, S. Korea

Boats, Books & Lab Girl

“My lab is a place where my guilt over what I haven’t done is supplanted by all of the things that I am getting done”Lab Girl

This is as good a place to start as any.

After yesterday’s post, I felt I had done something if only to document what still needed to be done. It didn’t have the effect I had expected, instead of accomplishment, I felt intimidated.

Yesterday’s post was also different in that usually I write a draft, upload the photos I want, then edit the next day, add pictures and post. But yesterday, I was in a hurry and wrote and posted within an hour, with minimal editing, thus you can see how my mood changed even in the course of the writing as evident in the last line.

After a number of bright (only spotty rain), warm (temps in the 60’s) days here in the south and east of Ireland, yesterday dawned like a winter day, dark, cloudy, steady drizzle.  Actually, typical pre-warm frontal weather, the result of an inverted trough, the low pressure system being to the south and the warm front moving in from the ESE.

Dauntless is not my lab, but it is an instrument in that lab. It facilitates me being in nature, good or bad, hot or cold.

The worse the weather, the more I have this need to put my face into it.  Certainly having to go to the bathroom, to pee, every few hours drives the need to go out there and check the elements, though the phrase to hold on for dear life, has no exaggeration at that point.

I’ve been trying to determine the best way to talk, to write about books that have a profound influence over me. I know many of my readers like the boating adventures and may not care about my soliloquys about life. So if you have any suggestions that I can get to work with WordPress, email me. I have made some additional pages, but don’t like the look so far.

Though it seems I have a wide interest in things, that interest really revolves around two main cores, science and history.  Thus my interest in Paleoclimatology, a field that a number of times in my life I considered going back to school to earn a PhD.   The last time about 15 years ago when I had just started teaching, I had attended a symposium at the National Center for Atmospheric Science (NCAR) on climate change. I was offered a very appealing opportunity, but having moved back to NYC for my mother, and having already given up a good job to do so, life prevailed.

But that Fate is what put me here now, writing this. Dauntless and I exploring the world at 7 miles per hour.

During the last month, I have been reading three books, all non-fiction, all three different, but amazing.  All three are fascinating in their own right and I have not finished any of them completely, I think in large part because I don’t want them to end:

  1. Terrible Swift Sword: The Life of General Philip H. Sheridan by Joseph WheelanSheridan

Having grown up near Sheridan Square I had a familiarity with Sheridan, yet realized I knew nothing about him other than him being a Calvary man doing the Civil War.  Then, just before leaving NYC this past March, I realized that the gold statue across from the Plaza Hotel at the SE corner of Central Park was also Sheridan.

So when I came across this book and in the opening pages was captivated by how much I did not know I knew I had to keep reading!  As obvious as it sounds now, Sheridan as Corps Commander, was the first to use infantry and cavalry as a combined weapon.

Also, the insights one learned about other personalities of the war, e.g. How effective Custer was, or how Meade although in total disagreement, when told by Grant to support Sheridan, actually did so, unlike so many other generals of the war who let their jealousies get in the way.

  1. Half Moon by Douglas Hunter about Henry Hudson who explored New York when he was supposed to be searching for the Northeast Yes, Northeast, as in above Russia, with a crew that spoke Dutch and he didn’t, in a boat only 20 feet larger than Dauntless.Hlaf Moon_
  1. And last, but not least, Lab Girl by Hope Jahren. A beautifully written book by, and about, a woman who lives for science. Wonderfully written because of the language she uses and her ability to relate the mysteries and explorations of science in a profound and moving way for a layman.  Thus my opening quote.

Science is about making connections that most don’t or can’t see. Like science, my lists are more than lists of things I must do.  They are maps of things to learn and things to practice. It’s what keeps me awake at night. The puzzle in the sky that is multiple realities, that makes it rain on your side of the hill, but not mine. Or the three prong plug that can run two different lights. They seem different, but are the same.

Thanks for listening.

 

Amazon links to the above three books:

https://www.amazon.com/gp/product/B0080K3F86/ref=oh_aui_d_detailpage_o04_?ie=UTF8&psc=1

https://www.amazon.com/Half-Moon-Hudson-Voyage-Redrew-ebook/dp/B002WOD8WY/ref=sr_1_2?s=digital-text&ie=UTF8&qid=1462706074&sr=1-2&keywords=half+moon

https://www.amazon.com/gp/product/B00Z3FYQS4/ref=oh_aui_d_detailpage_o00_?ie=UTF8&psc=1

 

 

 

.

Time is Flying; But My Head is in the Clouds

Or am I flying and that’s why my head is in the clouds?

Such weighty questions, so little time.

What else is new, as my friends would say?

Nice view of the River Barrow & Stratocumulus clouds
Nice view of the River Barrow & Stratocumulus clouds

I did make a list of all the things that still need to be done between now and the next few weeks.  It’s a long list.  Most of the small things I will do, as few big things are being done by the painter Gary and the Boat Yard.  So, what’s still to be done:

  • Electrical
    1. Run new VHF cable to the two radios
    2. Replace plugs for Navigation lights
    3. Add Name Board lights
    4. Install new Driving lights
    5. Add USB ports in salon and second cabin
    6. Add new switch and breaker panel for fridge/freezer in pilot house
    7. Add switch panel for solar panels
  • Forward Bilge
    1. Complete hookup of New Vetus holding tank, with new fittings and electrical
    2. Install new bilge pump (old one becomes spare) with new check valve
    3. Make additional fresh water hookup and run hose to forward compartment for Raritan Purisan
    4. Check connections for salt water pump (new, hasn’t worked since installed)
    5. We found a bare wall bulkhead in front of old holding tank. Gary sealed it and put Gelcoat on it.
    6. Check all clamps for the multitude of thru hulls in this area
  • Anchor Locker
    1. Pull all the chain and rode out for both anchors
    2. Vacuum the bottom of chain locker
    3. Replace two deck fittings for fresh & salt water connections
    4. Re-mark and reverse anchor chain
    5. Add 90 feet polypropylene to end of chain rode (this is because it floats, making it easier to find should I have to abandon anchor with no time for anything else)
    6. Paint anchors
    7. Find third anchor for stern
    8. Make up a new, longer chain snubber
  • Paravanes
    1. Restring birds to new line, 3/16” Amsteel, so that I can modify the depth of the birds.
    2. Boat Yard is making rocker stoppers for me to use while at anchor
  • Wood Trim
    1. Teak “eyebrow” around pilot house has been scrapped and sanded thanks to Leonie & Martin. I will put Tung Oil on it and see how that works.
    2. Oil all the benches that have been sanded
  • New Ross Boat Yard and Gary are completing:
    1. Port fuel tank sealant and new inspection ports
    2. New bottom job, with two coats of epoxy and one of a tie-coat
    3. New anti-foul by International, a semi-hard coating that is made for slow boats like Dauntless and should last at least a few years.
    4. Painting of the hull from the cap rails down, including the bow pulpit
    5. Fixing on of the side doors that while latched open this past winter the winds ripped if off the hook and broke the entire frame. (winds this winter were higher than 100 knots or 110 mph.
    6. New Bow thruster blades

That’s pretty much it for me!  I figure realistically, this list will be complete my 2018, though I will strive to get most of it done sooner.20160503_112928.jpg

Just goes to show that one thing I do well is plan; not so well, do.

I need a real doer in my life.

 

 

 

Two Inside Projects on Dauntless, Part 1

This winter has been the first real refit since we bought Dauntless three years ago.  When we bought this Krogen 42, she was in great shape, in fact the best shape of the 8 KK 42’s I looked at.  She had the lowest engine hours, only 1650, and some features we wanted: dual heads, four windows in the rear salon and no built-in furniture in the salon.  The Flexsteel leather furniture that the previous owner had gotten for the boat was like new.  The nicest leather we had ever felt.  We talked about that leather for two years before we actually were in a position to get D.

Middle top is fuel intake. behind it with the rust pattern underneath is the fuel vent.
Middle top is fuel intake. behind it with the rust pattern underneath is the fuel vent.

But with this little use, comes issues that are a result of that little use.

The port side fuel tank started leaking this past summer.  It was coming from the forward inboard seam. On opening up the inspection port, it had a lot of rust.  More rust than I had seen in the starboard tank.

Now since I had had the boat, I’d had problems with water getting into the tank.  During the last days of my Atlantic Passage, this became a critical problem that had me changing or emptying fuel filters every few hours.  You can read those details here: Dauntless-crosses-the-north-atlantic-the-post-mortem

Last summer in Holland, with the help of Marinus, another Krogen owner, I finally figured out the source of the water was the stink’in fuel vent.  In one of the few poor decisions Kadey Krogen made in the design of this boat, the fuel vent was under the rub rail.  As the Krogen rolls its way across the Atlantic this became an issue when I was in very big seas and the stabilizers were not working as well as they should for reasons related to operator (ME) error.

To fix the tank issues, we decided to add three more larger inspection ports. This will allow the two-part epoxy sealant to be applied.

the rust pattern underneath is the fuel vent.
the rust pattern underneath is the fuel vent.

Looking at the pictures of the opened tank, one can see the rust pattern from the water getting into the vent.

Also, when I had purposely overfilled this tank by about 10 gallons, in part to see what would happen, I had the unpleasant surprise to see fuel leaking out of the tank into the bilge.  It was not apparent where this fuel was coming from. This picture shows the fitting itself was poorly installed and the screws used rusted and basically left small holes for fuel to get out or even rain water that was on top of the tank to get in.

From the amount of rust, this tank was not sued for quite some time, years, but left with some water.  Once I got the boat, this tank had been the problem child, therefore I had a tendency not to use it as much, which ended up exacerbating the problem.

Fuel tank today after cleaning
Fuel tank today after cleaning

Here are some before pictures.  The after pictures will come when done.

Determined & Confident = Dauntless

So I am sitting in my little B&B in New Ross, County Wexford, Ireland, watching a Korean Drama called “Marriage, Not Dating”.  An apt title for a cutesy drama.

Dauntless gets a new bottom coat
Dauntless gets a new bottom coat. The beginning of the end.

Korean Dramas are my one reliable escape; giving my brain a rest from the planning of tomorrow and the reflection of yesterday.

There is still much to do on Dauntless, and while the bigger jobs are getting done, I do the small things that have been on the to do list for too long, such as:

  • the installation of a new set of “driving” lights,
  • adding USB and 12v receptacles in the pilot house and cabins, so I don’t have to lug the different chargers from place to place.
  • Remarking the anchor chain and cleaning out the chain locker,
  • Replacing a float switch for the forward bilge pump as well as its check valve,
  • Finish the installation of the Wallas heater, yes, that heater I told you I finished years ago!
  • Getting the salt water pump, though new, has never worked. I think it’s not connected in the electrical panel in the engine room.

We should be back in the water mid-May, then I will mosey on down to Waterford before heading north to Scotland at the end of the month.

Then, returning to Waterford in mid-June for a couple of weeks, as I have a quick trip to NYC, before leaving Ireland for good in early July.

I’ll miss Ireland; for such a well-travelled person, I am still amazed that for all the years I have been coming to Europe, 30 plus years at that, I only found the gem that Ireland is just recently.  A really shame, considering the amount of time I have spent wondering where I would live if I could live anyplace.  Italy and the Netherlands were always near the top of that list, then Korea jumped up in the last 10 years and even Spain has interest.  But for an English speaker, Ireland is just like Spain or Italy, except I’m fluent in the language.  And maybe because it is such a small country, like Latvia, Ireland is full of wonderful, helpful, friendly people.

The fact that they talk like New Yorkers just makes me feel even more like home.  Now I can also see why the Italians and Irish of NY did not always get along so well.  They are virtually identical and we all know that similarity breeds contempt.

With Dauntless entering my life, I no longer have to decide where to live.  Dauntless has given me the ability to live the life of a gypsy.  Don’t like this town, go to the next one. Don’t like this country, go to the next one.

I’m not a negative person.  In my life I have fought for those who cannot fight for themselves, kids, students, old folks in particular, but for myself, not much. I don’t like conflict.  I’d rather move on.  Just another aspect of living on a boat that at least for me makes life easier, not harder.

Seeing the world, being immersed in nature, whether you like it or not, are all benefits of being on a boat and crossing oceans.

Some of you may remember the long term plan was to do to Northeast Asia, Japan & Korea, after my time in Europe was up.  That time is finally almost here.  Earlier I had thought to spend another year in Europe, in Spain, but now realize it’s time to move on. Life gives you lemons, make lemonade. Corny, but true, much like many of the Korean dramas I watch.

Therefore, I’m excited that in just weeks’ time, we’ll be back in the water, looking a bit different and living up to the name Dauntless.

And with the end of summer will also signal the end of Europe for us for a long time.  Oh, I’ll still fly here to see both new and old friends, but Dauntless is heading to places only dreamed about.

I can’t wait.

New Ross Boat Yard

The Joanna Mary
The Joanna Mary

See some of the boats that kept Dauntless company for the windy, Ireland winter.

All boats were blocked AND STRAPPED DOWN for the winter winds, that were greater than 100 knots!!!

20160423_155454.jpg
Cats are Fat
20160423_155305.jpg
Just across the boat lift bay from Dauntless. I don’t think she is going anyplace this year either.
20160423_155148.jpg
Tie Downs are evident

It’s not called the “North20160423_155106.jpg Atlant

One of the Fastnet boats in the yard. They are based in Waterford.
One of the Fastnet boats in the yard. They are based in Waterford.

ic” fo20160423_155313.jpg20160423_155343.jpg20160423_154745.jpg20160423_155400.jpg20160423_155216.jpg20160423_154504.jpg20160423_155421.jpgr nothing.20160423_155400.jpg

The Joanna Mary in dry dock
The Joanna Mary in dry dock
A narrow canal barge
A narrow canal barge

20160423_155421.jpg

One of the Cats of the New Ross Boat Yard. The Travel lift was moving as he nonchalantly walked past.
One of the Cats of the New Ross Boat Yard.
The Travel lift was moving as he nonchalantly walked past.
This boat was a winner in the around Ireland race back in the '70's
The Sea Hunter was a winner in the around Ireland race back in the ’70’s
Dauntless was just put in the shed for painting.
Dauntless was just put in the shed for painting.

I’m Excited; Very Excited

Yes, that kind of excitement.

Dauntless is Put in the Shed
Dauntless is Put in the Shed

I’ve been playing with the numbers.

I like numbers:

  • 25 May 2016 to 01 November 2017, 525 days
  • 207 days underway; 17,000+ miles
  • $0.80 per nautical mile & $26 per day for fuel.
  • 4576 gallons of fuel; 17,321 liters
  • 10 oil changes, 145 quarts, 140 liters or 36 gallons of oil,

I like making a plan, executing the plan; sometimes even changing the plan.

Dauntless will have a look befitting her name in just a few weeks.

Then, in the water, fueled up and ready to go.

Friends for the US of A join us for a little jaunt to Scotland mid-May returning to Waterford Ireland in mid-June.

Then around the 4th of July, I’ll say goodbye to all my wonderful Irish friends in Waterford and New Ross.

Dauntless will turn south, putting Ireland behind us heading to France, then northwest Spain and Galicia.  I hope to be in San Sebastian in August, then heading west to A Coruna for September and October.

November will find us heading south, enjoying the fortified wines of Portugal and southern Spain.

Then it will be tackling the Straits of Gibraltar, yes, I have seen the film Das Boot, so I will be prepared.

After checking out the monkeys, we’ll fuel up and really begin an Odyssey.

 

Glimpses of Ireland

Working on the boat this week, getting her ready for painting.  That story and pictures will come soon.

And in a sudden development, the Cruise Plan 2016 & 2017 has been radically altered.  I’m working out the numbers now, so stay tuned to this channel for the exciting details.

So in the meantime, here are some relatively random shots of Ireland taken over the last three weeks:

In the dry dock at New Ross Boat Yard
In the dry dock at New Ross Boat Yard
20160416_132038.jpg
The Lock at St. Mullins
20160414_143049.jpg
Waterford bridge and hill
20160412_115927.jpg
Wexford Harbor

20160416_142103.jpg20160404_160519.jpg20160416_113400.jpg20160416_125342.jpg 20160416_132236.jpg 20160416_132209.jpg 20160416_134607.jpg 20160416_134656.jpg 20160416_140624.jpg 20160416_130335.jpg 20160416_132342.jpg 20160412_114913.jpg 20160413_183210.jpg

Trust

Fasten your seatbelt, we’re going for a ride with a few curves; fast ones.

Dauntless in the Boat Yard
Dauntless in the Boat Yard.

I went by Dauntless this morning, on yet another damp, grey Irish morning that is the reason grass grows on concrete here.  The work on the boat this past winter is being done at New Ross Boat Yard, just across the river from the Dunbrody Famine Ship.

Gary, the GRP (fiberglass) guy, has fixed the damage I have incurred the last three years, mostly dents and dings from too many docking maneuvers in which the fate of the western world must have hung in the balance, or at least I acted like it did.  Just ask anyone who has cruised with me.

My encounters with the rocks of Finland on the other hand had a more lasting impression.  The second rock in particular hit the side of the boat, not under the keel, like the first rock. By hitting the rock on the side of the hull, I almost sliced the hull open much like the Titanic.

The reason we did not have the same outcome says much about the difference between quality Kadey Krogen fiberglass design and construction versus English ship building 100 years ago that in their rush used rivets with too much slag in them, making them brittle.

So due to my inattention, Dauntless ended up with a four-foot-long gouge that did produce a hairline crack that went through the hull.  It was not until three months later, back in the river water of Waterford, that I realized it was river water in the forward bilge and not rain water, though at most it was about one bilge pump out a day, only about one inch of water and again, I have always had a somewhat wet forward bilge so I assumed it was just more rain.

But Gary also discovered a crack in the bulkhead that separates the forward bilge from the more rearward section where the water tanks are.  I had seen water dripping from that wall for quite a while, like at least two years.  In fact, the paint had peeled away from part of the bulkhead.  When I had returned to Dauntless in the beginning of December, Gary had showed me this bulkhead and explained it was not normal and in fact it was cracked, possibly done when I hit the rock last summer.  In any case, we came up with a plan for him to repair that damage also and now it’s all done.

Gary also suggested that the good construction of the boat allowed that bulkhead to absorb much of the force of the impact, thus leaving only a hairline crack in the hull and not a gaping hole, ala Titanic.

Now while Gary is doing his part, he will also be painting the upper hull, refinishing the bottom and putting a sealant in the port fuel tank.  Michael, Stephen and Denise of the New Ross Boat Yard are also doing their part.

They are cutting additional inspection ports in the port fuel tank to allow Gary to apply the sealant.  Besides blocking the boat and strapping her down so that the 100 knot winds that hit this area during the winter did not topple her over, they also are pulling my old holding tank which started leaking once again, so I am replacing it with a new Vetus plastic tank.  They will also finally remove the line from my bow thruster which made it in-op for most of my summer cruise, as well as apply a new commercial grade anti-fouling.

While working inside the boat, they have been very impressed with the workmanship of the KK.  Even mentioning the quality of the wall in the engine room that walls off the fuel tank: the battens behind the plywood that itself is covered by soundboard in the engine room.

Now while I have already paid Gary in full for his work, I don’t even have a quote from the Boat Yard.  Michael said he would give me a ballpark figure tomorrow, (ummm heard that before), but as I drove out of the parking lot, I had not worries.

None.

I reflected on why and it came down to Trust.

Now I do have an idea of the cost, but only based on what I think I know.  I have a “great” figure, the “probable” figure and an “OMG” figure in my head, but it comes down to me being at their mercy.

But then we are always at the mercy of professionals we depend on, from our doctor to the bus driver.

Some people try to learn everything the professionals know.  They die young, very young.  I like keeping my life simple. Oh I worry about a lot of things, reflect on virtually everything, but when it comes to people with more experience than I, either I trust them or I don’t.

And if I don’t, I don’t do business with them, don’t have them as friends and don’t date them.

There is no other way. Only lawyers think they can force someone do what they don’t want to do. But notice lawyers work for others, get paid my others to do what they do. But ultimately, a bureaucracy is result of mistrust, it tries to regulate and specify everything and simply does not work.

When people say that the handshake is the contract, they are saying what I am attempting to say. It’s about trust. No amount of words on paper can make someone do something the way it needs to be done, if they do not want to do it.

So, it’s about trust. Have I been burned by trusting the wrong person, or more like, the wrong bureaucracy? Of course, but all I can is move on.  I want to be healthy and happy as long as I can.

Trust is what got me across the Atlantic.  Trust in my crewmate and even more importantly, trust in the boat. Knowing that this Krogen was designed and made for far worse conditions that I will ever see.  Without trusting your boat, it’s hard to go anyplace where the water is deeper than 5 feet.

So, cinch that seatbelt now, as thinking of the above I had another realization.

Hurtful at that.

I once went on a much anticipated trip with a woman I really liked to a foreign land.  She spoke the language, was native in it in fact, so it was a natural to let her take the lead and do the talking.

Within minutes of arrival, it was clear to me that this woman did not trust anyone. Maybe not even me.  But her obvious lack of trust of everyone around her, quickly produced so much stress for all concerned that the trip and our fledgling relationship were soon done.

I still have regrets about that, even though the last 12 years of my life have been probably the best years I have ever had.

So why the regrets?  Because I let this person down.  Someone I clearly really cared about, I was too slow to see what she needed from me: my confidence, my control of events, my telling her “don’t worry honey, I’ll take care of it”.

That’s probably all it would have taken.  It’s what I do 90% of the time, the only reason it had not happened that time was because of her language skills.  But I have been in many situations where neither of us speak anything and I have always found a way to get by and have a great time doing it.

I don’t like letting anyone down. Friends, colleagues, people I worked for & who worked for me, strangers, doesn’t matter. Never ever.

So while I focused on her lack of trust, I was blind that she had put her trust in me and I had let her down, horribly.

Horrible – a word used a lot in Brooklyn.